Project Info
- Construction Date: April 2011
- Location: Rabigh
- Values: 15 million SAR
Project Details
SEPCO III (Rabigh Power Plant) Project
In SEPCO, we deal with major construction works for the development of concrete bases for the pipelines coming from the Shipyard to the reservoir of fuel. The work carried out by us include the following:
More Project Details
SEPCO III (Rabigh Power Plant) Project
In SEPCO, we deal with major construction works for the development of concrete bases for the pipelines coming from the Shipyard to the reservoir of fuel. The work carried out by us include the following:
Earthworks
Trimming, leveling , grading, placing, spreading, mixing, watering, back-filling, compacting to the specified proctor density, testing, sorting, loading, transport, trail fields etc.
Backfilling
Filling using selected excavated materials brought from external quarry. We do perfect compaction with our modern compacting equipments for a perfect result in accordance with the drawings and specifications.
Excavation
Excavation is carried out for various depth according to the specifications required including breaking of coral rocks, excavation of soil, dewatering, timbering, slopes and background compaction.
Concreting
It includes bedding course casting, casting foundation, expanded joint filling, reinforcement, form-work, embedding of plate and anchor bolts, waterproofing, concrete grouting etc. There are PCC(plane cement concrete) for under-layer of foundation and RCC (reinforced cement concrete) for foundation of pipe racks, trench, pit, tunnel etc.
Form-work
We do all type of form-works including design, fixing and removal form-work of approved quality for cast-in-situ, plain or reinforced concrete works of any type section for all elevations
Reinforcement
Cleaning, de-rusting, straightening, cutting, bending, binding in position with annealed wires or welding, supporting, providing concrete cover blocks, pins, separators’, chairs, binding wires, testing and preparation of bar bending schedules etc.
Galvanization
Galvanization and painting is done for the reinforcement in order toprevent corrosion. Also concrete waterproofing and anticorrosion treatment.
Non shrink grouting
Non shrink grouting for reinforced concrete work is done at all levels which is part of the work. After that, PVC water stops are being filled as per the requirements of the design.
Cover for trench
The provision and fitting precast design mix cement concrete with graded aggregate and the required admixtures for reinforced concrete works will be carried out.