Project Info
- Client Name: : Petro Rabigh
- Location: : Rabigh KSA
- Status: : Completed
Project Details
PETRORABIGH PROJECTS & GENERAL SERVICE CONTRACT Contract No. Project/Contract Title andBrief Description of Work Contract No: 4600003826, High Pressure Steam Header Installation ( 36" Pipe Installation & Tie in ) the systematic erection, alignment, fabrication, and installation of steam distribution piping systems designed to collect and distribute steam from the boiler to designated process units. […]
More Project Details
PETRORABIGH PROJECTS & GENERAL SERVICE CONTRACT
| Contract No. | Project/Contract Title and Brief Description of Work |
|---|---|
| Contract No: 4600003826, |
High Pressure Steam Header Installation ( 36" Pipe Installation & Tie in ) the systematic erection, alignment, fabrication, and installation of steam distribution piping systems designed to collect and distribute steam from the boiler to designated process units. The scope of work includes material handling, scaffolding, Excavation, installation of structural supports permanently precise pipe fit-up, welding, installation of permanent shoe supports on existing structural pipe racks, inspection and testing, insulation, and final commissioning, |
| Contract No. 4600003884 | General Service Contract ( GS ) |
| P.O. NO. 49000054403 / | Naphtha Reformer Off Gasses & Mix Lpg Feed Piping Installation to Ecr ( 12" ), |
| P.O. NO. 49000054307 | Waste Water Treatment Plant 1 Upgrade, Engineering ( Hot Tapping ) |
| P.O. NO. 49000053833 | Sales Gas Provision to Phase-1 Vaporize |
| P.O.NO. 49000055459 | Sour Water Transfer from D-005 A/B, V03 and Tank-16 to R-301 ( SWS ( 2" ) ) |
| P.O.NO. 4900053834 | Piping modification to Take C3 LPG as FEED for ECR from TK-240/241 ( 4" ) |
| P.O.NO. 4900053872 | Gate-1 Powering Up Sed Building-209, LED Screen, & Install EDG at Gate # 01 |
| P.O.NO. 4900054212 | SRU2 Tail Gas Treatment Project, 3rd Party Services |
| P.O.NO. 4900054087 | Permanent Line to Provide CO2 from MEG to T-1880. ( 2" ) |
| P.O.NO. 4900054086 | Install Heavy Treated Naphta Jump Over Line from Heavy Treated Naphta Pump Discharge to C9/C10 Aromatics Blending Line |
| P.O.NO. 4900053873 | Mixed C4 assist Gas Replacement with sales gas, AXL TK-7 Modification for Crude Oil, |
| P.O.NO. 4900054682 | Upgrade the steam and waste gas control system at old refinery |
| P.O.NO.4900054745 | Install a spill back line on 10" OWS & 36" SYS Headers |
| P.O. NO. 4900054778 | Installation of AFA Injection Unit in Butene 1 Plant |
| P.O.NO. 490054815 | Steam Rings around Naphtha Reactors Inlet & Outlet Flanges |
| P.O.NO. 4900054896 | Phase II Fuel Gas System Automation, Manpower Supply Monomer II ( Phase II )MMA/PMMA ongoing Turnaround ) |