Petro Rabigh- High Pressure Steam Header Installation

Project Info
  • Client Name: : Petro Rabigh
  • Location: : Rabigh KSA
  • Status: : Completed
Project Details

PETRORABIGH PROJECTS & GENERAL SERVICE CONTRACT Contract No. Project/Contract Title andBrief Description of Work Contract No: 4600003826, High Pressure Steam Header Installation ( 36" Pipe Installation & Tie in ) the systematic erection, alignment, fabrication, and installation of steam distribution piping systems designed to collect and distribute steam from the boiler to designated process units. […]

More Project Details
PETRORABIGH PROJECTS & GENERAL SERVICE CONTRACT
Contract No. Project/Contract Title and
Brief Description of Work
Contract No: 4600003826, High Pressure Steam Header Installation ( 36" Pipe Installation & Tie in )
the systematic erection, alignment, fabrication, and installation of steam distribution piping systems designed to
collect and distribute steam from the boiler to designated process units. The scope of work includes material
handling, scaffolding, Excavation, installation of structural supports permanently precise pipe fit-up, welding,
installation of permanent shoe supports on existing structural pipe racks, inspection and testing, insulation,
and final commissioning,
Contract No. 4600003884 General Service Contract ( GS )
P.O. NO. 49000054403 / Naphtha Reformer Off Gasses & Mix Lpg Feed Piping Installation to Ecr ( 12" ),
P.O. NO. 49000054307 Waste Water Treatment Plant 1 Upgrade, Engineering ( Hot Tapping )
P.O. NO. 49000053833 Sales Gas Provision to Phase-1 Vaporize
P.O.NO. 49000055459 Sour Water Transfer from D-005 A/B, V03 and Tank-16 to R-301 ( SWS ( 2" ) )
P.O.NO. 4900053834 Piping modification to Take C3 LPG as FEED for ECR from TK-240/241 ( 4" )
P.O.NO. 4900053872 Gate-1 Powering Up Sed Building-209, LED Screen, & Install EDG at Gate # 01
P.O.NO. 4900054212 SRU2 Tail Gas Treatment Project, 3rd Party Services
P.O.NO. 4900054087 Permanent Line to Provide CO2 from MEG to T-1880. ( 2" )
P.O.NO. 4900054086 Install Heavy Treated Naphta Jump Over Line from Heavy Treated Naphta Pump Discharge to C9/C10 Aromatics Blending Line
P.O.NO. 4900053873 Mixed C4 assist Gas Replacement with sales gas, AXL TK-7 Modification for Crude Oil,
P.O.NO. 4900054682 Upgrade the steam and waste gas control system at old refinery
P.O.NO.4900054745 Install a spill back line on 10" OWS & 36" SYS Headers
P.O. NO. 4900054778 Installation of AFA Injection Unit in Butene 1 Plant
P.O.NO. 490054815 Steam Rings around Naphtha Reactors Inlet & Outlet Flanges
P.O.NO. 4900054896 Phase II Fuel Gas System Automation, Manpower Supply Monomer II ( Phase II )MMA/PMMA ongoing Turnaround )